Q-2, r. 19 - Regulation respecting the landfilling and incineration of residual materials

Full text
107. Every construction or demolition waste landfill must have a system that collects and removes the biogas produced in the landfill.
The system must be in operation not later than 1 year after a disposal area has received a final cover.
O.C. 451-2005, s. 107.